MANUFACTURERS' BUILD-OUT AND START-UP DATES

Below you can click through any of the various manufacturers' build-out and start-up dates for US cars and US trucks. Please be aware these dates change regularly.

Audi

Audi Build-Out & Start-Up Dates

Model

2018 Order Banks Open 2018 Production Startup 2018 Lead Time 2018 Order Cutoff 2019 Order Banks Open 2019 Production Startup 2019 Lead Time 2019 Order Cutoff

CARS

A3 N/A N/A N/A Built Out 06/01/18 08/01/18 N/A TBD

A4

N/A N/A N/A Built Out 06/01/18 08/01/18 N/A TBD

A5

N/A N/A N/A Built Out 06/01/18 08/01/18 N/A TBD
A6 N/A N/A N/A Built Out TBD 06/26/18 N/A TBD
A7 N/A N/A N/A Built Out 07/01/18 06/26/18 N/A TBD
A8 N/A N/A N/A TBD 05/01/18 07/03/18 N/A TBD
R8 N/A N/A N/A TBD TBD TBD N/A TBD
TT N/A N/A N/A Built Out 06/01/18 09/04/18 N/A  

TRUCK

A4

N/A N/A N/A Built Out 06/01/18 08/01/18 TBD TBD
Q3 N/A N/A N/A Built Out Q12019 Q12019 TBD TBD
Q5 N/A N/A N/A Built Out 06/01/18 09/01/18 TBD TBD
Q7 N/A N/A N/A Built Out 06/01/18 07/02/18 TBD TBD
























The following chart provides vehicle build-out and start-up dates for Audi cars. These updates change regularly and were last updated on June 20, 2018.
Back to Top ^

Buick

Buick Build-Out & Start-Up Dates

Model

2018 Order Banks Open

2018 Production Startup

2018 Lead Time

2018 Order Cutoff

 2019 Order Banks Open 2019 Production Startup 2019 Lead Time  2019 Order Cutoff 

CARS

       

Cascada

05/11/17

08/14/17 

20-22 weeks

Built Out

02/15/18 05/02/18 TBD   TBD 

LaCrosse

03/16/17

07/31/17

9-11 weeks

Built Out

 03/29/18 06/04/18 TBD   TBD

Regal

06/22/17

3Q2017

19-21 weeks

Built Out

04/26/18 07/30/18 TBD   TBD 

Verano

TBD

TBD TBD  

TBD

TBD  TBD  TBD  TBD 

CROSSOVER

       

Enclave

06/08/17

3Q2017 

8-10 weeks

Built Out

04/26/18   06/18/18  TBD  TBD 

Encore

05/25/17

07/24/17

27-29 weeks

Built Out

03/29/18   06/04/18   TBD   TBD 

Envision

04/13/17

08/07/17

24-26 weeks

Built Out

11/23/17 03/05/18  TBD    TBD 
The following chart provides vehicle build-out and start-up dates for Buick cars. These updates change regularly and were last updated on June 20, 2018.
Back to Top ^

Cadillac

Cadillac Build-Out & Start-Up Dates
07/10/2017 8-10 weeks

Model

2018 Order Banks Open

2018 Production Startup

2018 Lead Time

2018 Order Cutoff

2019  Order Banks Open  2019 Production Startup  2019 Lead Time  2019 Order Cutoff 

CARS

       

ATS Coupe

04/27/17

07/10/17

7-9 weeks

Built Out

05/10/18 08/01/18 TBD TBD 
 ATS Sedan 04/27/17 07/10/17 7-9 weeks  Built Out 05/10/18 07/16/18 TBD TBD 

ATS V Series - Sedan & Coupe


04/27/17

07/10/17

7-9 weeks

Built Out

05/10/18  07/16/18  TBD  TBD

CT6

02/16/17 

04/24/17

8-10 weeks

06/28/18

07/19/18  09/17/18 TBD TBD 

CTS

04/27/17

07/10/17

7-9 weeks

Built Out 05/10/18  07/16/18 TBD TBD 

ELR

TBD

TBD

TBD

TBD TBD  TBD  TBD  TBD 

XTS

06/22/17

08/22/17

9-11 weeks

Built Out

03/29/18 06/04/18 TBD  TBD 

SUVS & CROSSOVERS

       

Escalade

06/22/17

08/21/17

8-10 weeks

Built Out

05/10/18 07/09/18 TBD TBD 

Escalade ESV

06/22/17

08/21/17

8-10 weeks

Built Out

05/10/18 07/09/18 TBD TBD 

SRX Luxury

TBD 

TBD  TBD 

TBD

TBD  TBD  TBD  TBD 

XT5

05/11/17  7/13/17

8-10 weeks

Built Out

04/26/18 06/11/18 TBD  TBD 
The following chart provides vehicle build-out and start-up dates for Cadillac cars. These updates change regularly and were last updated on June 20, 2018.
Back to Top ^

Chevrolet

Chevrolet Build-Out & Start-Up Dates
07/24/17 6-8 weeks 6-8 weeks 12-24 weeks

Model

2018 Order Banks Open

2018 Production Startup

2018 Lead Time

2018 Order Cutoff

2019 Order Banks Open  2019 Production Startup  2019 Lead Time  2019 Order Cutoff 

CARS

       

Bolt

10/26/17

12/18/17

7-9 weeks

Built Out

05/10/18 07/30/18 TBD  TBD 

Camaro Coupe &Convertible

04/13/17

06/12/17

13-15 weeks

Built Out

06/21/18 08/20/18 TBD  TBD 

Corvette Stingray Coupe & Convertible

04/13/17

06/05/17

10-12 weeks

Built Out

11/23/17 01/29/18  TBD  TBD 

Corvette Z06 Coupe & Convertible

04/13/17

06/05/17

10-12 weeks

Built Out 11/23/17 01/29/18 TBD TBD 

Cruze Hatchback

05/11/17

07/24/17 9-11 weeks

Built Out

06/07/18 08/20/18 TBD TBD 

Cruze Sedan


05/11/17

08/02/17

9-11 weeks

Built Out

06/07/18 08/06/18 TBD  TBD 

Impala

04/13/17

06/05/17

9-11 weeks

Built Out

04/26/18 06/18/18 TBD  TBD 

Malibu

04/27/17

06/19/17

9-11 weeks

07/26/18

08/02/18 09/24/18 TBD TBD 

Sonic

05/25/17

07/24/17

8-10 weeks

Built Out

05/10/18 07/30/18 TBD TBD 

Spark

03/20/17

10/02/17

26-28 weeks

Built Out

04/12/18 06/04/18 TBD TBD 

Spark Electric(CA & OR; GMCL Only)

03/30/17

06/01/17

25-27 weeks

TBD

TBD TBD  TBD  TBD 

Volt

04/27/17

07/24/17

8-10 weeks

Built Out

06/21/18 08/20/18 TBD  TBD

TRUCKS

       
Colorado Crew Cab 05/25/17 07/24/17  7-9 weeks Built Out 05/24/18 07/16/18 TBD   TBD 
Colorado Extended Cab  05/25/17 07/24/17  7-9 weeks  Built Out 05/24/18   07/16/18  TBD   TBD 

Silverado LD/1500 Reg Cab

04/27/17

07/10/17

9-11  weeks

Built Out

06/21/18 TBD   TBD  TBD 

Silverado LD/1500Double Cab

04/27/17

07/10/17

9-11  weeks

Built Out

06/21/18 4Q18 TBD  TBD 

Silverado LD/1500Crew Cab

04/27/17

07/24/17

9-11 weeks

08/23/18

TBD  TBD  TBD  TBD 

Silverado HD/2500/3500 Reg Cab SRW

05/11/17

07/10/17

12-14 weeks

Built Out

03/29/18 06/09/18  TBD   TBD 

Silverado HD/2500/3500 Reg Cab DRW

05/11/17

07/10/17

12-14  weeks

Built Out

03/29/18 06/09/18 TBD   TBD 

Silverado HD/2500/3500 DoubleCab

05/11/17

07/10/17

9-11  weeks

Built Out 03/29/18  07/16/18 TBD   TBD 

Silverado HD/2500/3500 Crew Cab SRW

05/11/17

07/10/17

8-10 weeks

Built Out

03/29/18 06/09/18 TBD   TBD 

Silverado HD/2500/3500 Crew Cab DRW

05/11/17

07/10/17

8-10 weeks

Built Out

03/29/18 06/09/18  TBD  TBD 
 Low Cab Forward Model 3500HD 06/8/2017 Oct. 2017 TBD Built Out TBD  TBD   TBD  TBD
Low Cab Forward Models  3500/4500 07/6/2017 Oct. 2017  TBD  06/30/18 06/21/18 Q3 2018  TBD  TBD

VANS

       

City Express

06/08/17

10/03/17

23-25 weeks

08/24/17

TBD TBD TBD TBD

Express Cargo(excld. FGO & FBC order types)

08/31/17

11/13/17

7-9 weeks

Built Out

06/21/18 08/20/18 TBD  TBD

Express Cargo(incld. FGO & FBC ordertypes)

08/31/17

 

11/13/17

7-9  weeks

Built Out 06/21/18 08/20/18 TBD  TBD

Express Cutaway(excld. FGO & FBC order types)

08/31/17

11/13/17


16-18  weeks

Built Out

06/21/18 08/20/18 TBD  TBD

Express Cutaway(incld. FGO & FBC ordertypes)

08/31/17

11/13/17

16-18 weeks

Built Out

06/21/18 08/20/18 TBD TBD 

Express Passenger(excld. FGO & FBC ordertypes)

08/31/17

11/13/17

7-9  weeks

Built Out

06/21/18 08/20/18 TBD TBD
 Express Passenger(incld. FGO & FBC ordertypes) 08/31/17 11/13/17 7-9  weeks Built Out 06/21/18  08/20/18 TBD  TBD

SUVS & CROSSOVERS

       

Equinox

10/27/16

1Q17

9-11 weeks

Built Out

04/12/18 06/11/18 TBD TBD 

Suburban

06/22/17

08/21/17

8-10 weeks

Built Out

05/10/18 07/09/18 TBD TBD 

Tahoe

06/22/17

08/21/17

8-10 weeks

Built Out

05/10/18 07/09/18 TBD  TBD 

Tahoe Police

06/22/17

08/21/17

13-15 weeks

Built Out

05/10/18 07/09/18 TBD TBD 

Traverse

03/16/17

2Q17

9-11 weeks

Built Out

04/26/18 06/18/18 TBD  TBD 

Trax

06/08/17

08/03/17

12-14 weeks

Built Out

05/10/18 07/02/18 TBD  TBD 

The following chart provides vehicle build-out and start-up dates for Chevrolet cars. These updates change regularly and were last updated on June 20, 2018.
Back to Top ^

Chrysler

Chrysler Build-Out & Start-Up Dates

Model

2018 Order Banks Open  2018 Production Startup  2018 Lead Time  2018 Order Cutoff   2019 Order Banks Open 2019 Production Startup 2019 Lead Time  2019 Order Cutoff 

CARS

 

200 Sedan

TBD  TBD  TBD  TBD  TBD TBD  TBD  TBD 

300/300C

06/08/17 07/24/17 8-10 weeks Built Out 6/8/18
8/20/18 TBD  TBD 

Fiat 500/500L

09/11/17 09/28/17 TBD  10/11/18 11/09/18 01/02/19 TBD  TBD 

Fiat 500X

09-11-17 09/28/17 TBD  10/11/18 11/09/18 01/02/19 TBD TBD

VANS

 

Pacifica

06/08/17 08/07/17 8-10 weeks Built Out 6/8/18 8/6/18 TBD TBD

Pacifica Hybrid

06/08/17  08/07/17  8-10 weeks TBD  6/8/18
8/6/18
TBD
TBD
Town and County TBD TBD  TBD  TBD  TBD
TBD
TBD
TBD
The following chart provides vehicle build-out and start-up dates for Chrysler cars. These updates change regularly and were last updated on June 20, 2018.
Back to Top ^

Dodge

Dodge Build-Out & Start-Up Dates

Model

2018 Order Banks Open  2018 Production Startup  2018 Lead Time  2018 Order Cutoff  2019 Order Banks Open 2019 Production Startup 2019 Lead Time 2019 Order Cutoff

CARS

 

Challenger

06/08/17  07/24/17 8-10 weeks  Built Out 06/08/18 08/20/18 TBD TBD

Charger

06/08/17 07/24/17 8-10 weeks  Built Out 06/08/18
08/20/18 TBD TBD

Police Charger

06/08/17 07/24/17  8-10 weeks  Built Out 06/08/18 08/20/18 TBD
TBD

VANS

 

Grand Caravan*

06/09/16  08/08/16 10-12 weeks  Built Out 06/08/18 07/30/18 TBD TBD

SUVS & CROSSOVERS

 

Durango

06/09/17  07/25/16 10-12 weeks  Built Out 06/08/18 08/28/18 TBD TBD

Durango Special Service

06/09/17 07/25/16 10-12 weeks Built Out 06/08/18 08/28/18 TBD TBD

Journey

06/09/17 07/24/16 10-12 weeks 10/11/18 11/09/18 01/02/19 TBD TBD
Grand Caravan*: 2017 Grand Caravan production for Fleet Vehicles is not available from 9/1/17 to 12/3/17. If vehicles are required to be built prior to 9/1/17, orders must be submitted by 6/15/17.

The following chart provides vehicle build-out and start-up dates for Dodge cars. These updates change regularly and were last updated on June 20, 2018.
Back to Top ^

Ford

Ford Build-Out & Start-Up Dates
Built Out 8-10 weeks TBD

Model

2018 Order Banks Open  2018
Production Startup
 
2018 Lead Time  2018 Order Cutoff  2019 Order Banks Open 2019 Production Startup 2019 Lead Time 2019 Order Cutoff

CARS

 

CMAX

07/17/17 10/09/17 12-14 weeks  Built Out TBD TBD TBD TBD

Fiesta

09/11/17 12/11/17 18-20 weeks  Built Out 06/13/18 09/17/18 TBD TBD

Focus / Focus BEV

07/17/17 10/09/27 12-14 weeks  Built Out TBD TBD TBD TBD

Fusion

04/07/17 08/07/17 10-12 weeks Built Out 05/21/18 08/14/18 TBD TBD 

Fusion Hybrid

04/07/17 08/07/17 10-12 weeks  Built Out 05/14/18 08/13/18 TBD TBD

Taurus

 08/01/17 11/04/17 12-14 weeks  Built Out 06/13/18 09/10/18 TBD TBD

Taurus PI Sedan

 07/18/17 11/06/17  12-14 weeks  Built Out 06/13/18 09/10/18 TBD TBD

Taurus PI Sedan VSO

07/18/17 11/13/17 12-14 weeks  Built Out 07/09/18 10/08/18 TBD TBD
 Fusion Police VSO  N/A N/A  N/A N/A  05/21/19 09/11/18 TBD  TBD
 Mustang  07/25/17 10/02/17 12-14 weeks  Built Out 03/26/18 06/14/08 14-16 weeks TBD

TRUCKS

 
 Ranger TBD  TBD  TBD  TBD  08/13/18   11/26/18 TBD TBD 
F-150 DTP 05/15/17 07/17/17 16-18  weeks 08/10/18 08/12/18 10/22/18 TBD TBD

F150 KCAP

 05/15/17 08/14/17  16-18  weeks  08/10/18 08/12/18 12/03/18 TBD TBD

F150 KCAP VSO

 05/15/17 09/11/17 16-18  weeks  06/01/18 09/10/18 01/07/19 TBD TBD
 F150 Diesel/Police DTP TBD  TBD  16-18 weeks 08/10/18 01/12/18  02/26/18  TBD  TBD 
 F150 Diesel/Police KCAP TBD  TBD  16-18 weeks  08/10/18 01/12/18  03/10/18  TBD  TBD 

Super Duty F250-F350 (without VSO Content)

 09/13/17 11/20/17  18-20 weeks Built Out 03/02/18 06/18/18 TBD TBD

Super Duty F250-F350 VSO Paint

 09/13/17 12/18/17  18-20 weeks  Built Out 04/06/18 07/23/18 TBD TBD

Super Duty F250-F350 VSO Equipment

 09/13/17 12/18/17  18-20 weeks Built Out 04/06/18 07/23/18 TBD TBD

Super Duty F450-F550 6.8L Gas Engine

 09/13/17 11/20/17  18-20 weeks  Built Out 03/02/18 06/18/18 TBD TBD

Super Duty F450-F550 (without VSO Content)

 09/13/17 11/20/17   18-20 weeks Built Out 03/02/18  06/18/18 TBD TBD

Super Duty F450-F550 VSO Equipment

 09/13/17 12/18/17    18-20 weeks Built Out 04/06/18 07/23/18 TBD TBD

Super Duty Cab Chassis

 09/13/17 11/20/17   18-20 weeks  Built Out 03/02/18 06/18/18 TBD TBD

Medium Truck F650/ F750

 06/14/17 10/09/17 18-20 weeks  Built Out 03/12/18 06/25/18 TBD TBD

Medium Truck F650/ F750 6.8L Gas Engine

 06/14/17 10/09/17 18-20 weeks  Built Out 03/12/18 06/25/18 TBD TBD
Medium Truck F650 - F750 VSO  06/12/17 10/30/17 18-20 weeks Built Out 04/09/18 07/23/18 TBD TBD
Motorhome 02/24/17 05/01/17 18-20 weeks Built Out 03/12/18 06/25/18 TBD TBD
Motorhome VSO 02/24/17 05/01/17 18-20 weeks Built Out 04/09/18 07/23/18 TBD TBD

VANS

 

Econoline Cutaway

 07/17/17  10/02/17 16-18 weeks Built Out 05/21/18 09/04/18 18-20 weeks TBD

Econoline Cutaway 5.4L Engine

 07/17/17 10/02/17 16-18  weeks  Built Out 04/06/18 06/25/18 18-20 weeks TBD

Econoline Cutaway VSO

 07/17/17 10/30/17 16-18  weeks Built Out 05/21/18 09/04/18 18-20 weeks TBD
 Econoline  07/17/17  10/02/17 16-18  weeks Built Out 04/18/18 06/25/18 TBD TBD
 Econoline VSO 07/17/17  10/30/17  16-18  weeks Built Out 05/14/18 07/23/18 TBD TBD

Transit Connect

03/20/17 06/28/17 22-24  weeks  Built Out Long Wheel Base Production Startup 6/28/17; Short Wheel Base Production Startup 7-12-17 03/19/18 05/28/18 TBD TBD

TRANSIT VANS

 

Transit Van

Medium & High Roof, Long & Ext. Wheelbase (E2C, E2D, F4U, F4X, R2C,R2D, R2U, R2X, R3U, R3X, S4U, S4X,W2C, W2D, W2U, W2X, W3U, W3X)

06/12/17 09/05/17 18-20  weeks  Built Out 05/15/18 08/13/18 TBD TBD

Transit Cutaway

Chassis Cab (F6P, F6Z, F8P, F8Z,F9P,F9Z, R5P, R5Z, R7P, R7Z, S6P,S6Z,S8P, S8Z, S9P, S9Z, W7P, W7Z)

 06/12/17 09/05/17 18-20  weeks  Built Out 05/15/18 08/13/18 TBD TBD

Transit Wagon

Medium & High Roof, Long & ExtWheelbase (K2C, K2X, U3X, X2C*, X2X*, U4X)
*MY17 - 15 pass - High Delay (incremental 4-6 wks)

06/12/17 09/05/17 18-20  weeks Built Out 05/15/18 08/13/18 TBD TBD

Transit Van & Wagon

Low Roof, Medium & LongWheelbase (E1Y, E1Z, E2Y, E9Z,K1Y, K1Z, K3Y, K2Z, R1Y, R2Y, R2Z,W2Y, W2Z, X2Y*, X2Z*)
*MY17 - 15 Pass - High Delay (incremental 4-6 wks)

 06/12/17 09/05/17 18-20  weeks  Built Out 05/15/18 08/13/18 TBD TBD

Transit Van& Wagon- VSO

 06/12/17 12/18/17 18-20 weeks  Built Out 06/12/18 09/14/18 TBD TBD

Transit Van & Wagon

Medium Roof, Medium Wheelbase (E1C, E1D, K1C, R1C, R1D)

 06/12/17 09/05/17 18-20  weeks Built Out 05/15/18 08/13/18 TBD TBD

SUVS & CROSSOVERS

 
Ecosport 06/19/17 9/11/17 22-26 weeks Built Out 06/01/18 07/16/18 10/01/18 TBD

Edge

07/17/17  09/27/17 10-12  weeks Built Out 06/13/18 09/04/18 TBD TBD

Escape

06/12/17 08/28/17 16-18 weeks 06/29/18 07/16/18 10/08/18 TBD TBD

Expedition

06/12/17 09/25/17  20-22  weeks 06/29/18 07/18/18 10/15/18 TBD TBD

Explorer

08/01/17 10/23/17 12-14 weeks  Built Out 06/13/18 09/10/18 TBD TBD

PI Utility

07/18/17 10/26/17 12-14 weeks Built Out 06/13/18 09/10/18 TBD TBD

Explorer VSO PI Utility

07/18/17 11/13/17 12-14 weeks  Built Out 07/09/18 10/08/18 TBD TBD

Flex

04/17/17  06/19/17  12-14 weeks  Built Out 02/12/18 05/14/18  20-22 weeks TBD



26-28 weeks







































11/20/17
11/20/17
11/20/17
The following chart provides vehicle build-out and start-up dates for Ford cars. These updates change regularly and were last updated on June 20, 2018
Back to Top ^

GMC

GMC Trucks, SUVs, Vans & Crossovers Build-Out & Start-Up Dates
07/10/17 10-12 weeks 12-14 weeks 9-11 weeks 8-10 weeks 9-11 weeks  9-11 weeks 8-10 weeks

Model

2018 Order Banks Open

2018 Production Startup

2018 Lead Time

2018 Order Cutoff

2019 Order Banks Open  2019 Production Startup 2019 Lead Time  2019 Order Cutoff 

TRUCKS

       

Canyon Crew Cab

05/25/17

07/24/17

7-9 weeks

Built Out

05/24/18 07/16/18 TBD   TBD 

Canyon Extended Cab

05/25/17

07/24/17

7-9 weeks

Built Out

05/24/18  07/16/18 TBD   TBD

Sierra LD/1500 Reg Cab

04/27/17

07/10/17

9-11  weeks

Built Out

TBD    6/21/2018 TBD   TBD 

Sierra LD/1500 Ext Cab

04/27/17

07/10/17

9-11  weeks

Built Out 03/29/18 06/11/18 TBD  TBD

Sierra LD/1500 Crew Cab

04/27/17

07/24/17

9-11 weeks

07/26/18

 TBD  TBD TBD  TBD

Sierra HD/2500/3500 Reg Cab SRW

05/11/17

07/10/17

12-14 weeks

Built Out

03/29/18  06/09/18 TBD  TBD

Sierra HD/2500/3500 Reg Cab DRW

05/11/17

07/10/17

12-14  weeks

Built Out

03/29/18 06/09/18 TBD   TBD 

Sierra HD/2500/3500 Double Cab

05/11/17

07/10/17

9-11  weeks

Built Out

03/29/18 07/16/18 TBD   TBD 

Sierra HD/2500/3500 Crew Cab SRW

05/25/17

07/31/17

8-10 weeks

Built Out  03/29/18 06/09/18 TBD  TBD

Sierra HD/2500/3500 Crew Cab DRW

05/25/17

07/31/17

8-10 weeks

Built Out

03/29/18 06/09/18 TBD   TBD

VANS

       

Savana Cargo (excld. FGO & FBC ordertypes) 

08/31/17

11/13/17

9-11 weeks

Built Out

TBD  TBD TBD 

Savana Cargo (incld. FGO & FBC ordertypes) 

08/31/17

11/13/17

9-11 weeks

Built Out

 TBD  TBD TBD   TBD 

Savana Cutaway (excld. FGO & FBC ordertypes) 

08/31/17

11/13/17

12-14  weeks

Built Out

TBD TBD TBD   TBD 

Savana Cutaway (incld. FGO & FBC ordertypes) 

08/31/17

11/13/17

12-14  weeks

Built Out

TBD  TBD TBD   TBD 

Savana Passenger (excld.FGO & FBC order types) 

08/31/17 11/13/17

9-11   weeks

Built Out

TBD  TBD TBD   TBD 

Savana Passenger (incld.FGO & FBC order types) 

08/31/17

11/13/17

9-11 weeks

Built Out

TBD  TBD TBD  TBD 

SUVS &CROSSOVERS

       

Acadia (next generation)

05/11/17

07/13/17

8-10 weeks 

Built Out

04/26/18 06/18/18 TBD   TBD 

Terrain

03/16/17

2Q17

9-11 weeks

Built Out

04/12/18 06/11/18 TBD  TBD 

Yukon

06/22/17

08/21/17

8-10  weeks

Built Out

05/10/18 07/09/18 TBD  TBD 

Yukon XL

06/22/17

08/21/17

8-10  weeks

Built Out

05/10/18  07/09/18 TBD   TBD 


























2018 Lead Time
2018 Lead Time
The following chart provides vehicle build-out and start-up dates for GMC trucks, vans, SUV's and crossovers. These updates change regularly and were last updated on June 20, 2018.
Back to Top ^

Jeep

Jeep Build-Out & Start-Up Dates

Model

 2018 Order Banks Open  2018 Production Startup 2018 Lead Time  2018 Order Cutoff  2019 Order Banks Open 2019 Production Startup 2019 Lead Time 2019 Order Cutoff

Cherokee

06/08/17 07/24/17 8-10 weeks 09/28/17 11/01/17 12/18/17 TBD TBD

Compass

TBD  06/30/17  10-12 weeks Built Out 06/08/18 08/06/18 TBD TBD

Grand Cherokee

06/08/17 07/24/17 10-12 weeks  Built Out 06/08/18 08/28/18 TBD TBD

Patriot

TBD TBD  8-10 weeks  TBD  TBD TBD TBD TBD

Renegade

10/12/17 11/21/17 10-12 weeks  TBD  TBD TBD TBD TBD

Wrangler (2-Door)

08/10/17  10/02/17 10-12 weeks 07/19/18 09/13/18 10/29/18 TBD TBD

Wrangler (4-Door)

08/10/17 10/02/17 10-12 weeks 07/19/18 09/13/18 10/29/18 TBD TBD
The following chart provides vehicle build-out and start-up dates for Jeeps. These updates change regularly and were last updated on June 20, 2018.
Back to Top ^

Lincoln

Lincoln Build-Out & Start-Up Dates

Model

2018 Order Banks Open
2018 Production Startup  2018 Lead Time  2018 Order Cutoff   2019 Order Banks Open 2019 Production Startup 2019 Lead Time 2019 Order Cutoff

CARS

 
Continential 07/05/17 09/18/17 10-12 weeks 06/29/18 02/12/18 10/01/18 TBD TBD

MKS

TBD TBD TBD TBD 02/12/18 TBD 12-14 weeks TBD

MKZ

06/19/17 09/06/17  8-10 weeks Built Out 05/21/18 08/14/18 TBD TBD

SUVS & CROSSOVERS

 

MKC

06/12/17 08/28/17 12-14 weeks Built Out 02/12/18 05/07/18 16-18 weeks TBD

MKT

04/17/17 06/19/17 12-14 weeks Built Out 02/12/18 05/14/18 18-20 weeks  TBD

MKX/Nautilus

07/17/17 09/18/17 10-12 weeks Built Out 06/13/18 09/04/18 TBD TBD
Navigator 06/12/17 09/25/17 16-18 week 06/29/18 07/18/18 10/15/18 TBD TBD























 08/28/17
The following chart provides vehicle build-out and start-up dates for Lincoln cars. These updates change regularly and were last updated on June 20, 2018.
Back to Top ^

Nissan

Nissan Build-Out & Start-Up Dates

Model

 2018 Order Banks Open  2018 Deliveries Begin 2018 Lead Time  2018 Order Cutoff  2019 Order Banks Open 2019 Production Startup 2019 Lead Time 2019 Order Cutoff

CARS

 

370Z Coupe

02/15/17 TBD  TBD  TBD  11/15/17 TBD TBD 11/01/18

370Z Roadster

02/15/17 TBD  TBD  TBD  11/15/17 TBD TBD 11/01/18

Altima Sedan

05/15/17 TBD  TBD  Built Out 06/01/18 TBD TBD TBD
Leaf 08/15/17 TBD  TBD Built Out 06/01/18 TBD TBD TBD

Maxima

05/15/17 TBD  TBD Built Out 08/01/18 TBD TBD TBD

Sentra

06/15/17 TBD  TBD Built Out 04/15/18 TBD TBD TBD

Versa Note (Hatchback)

04/15/17 TBD  TBD Built Out 04/15/18 TBD TBD TBD

Versa Sedan

 04/15/17 TBD  TBD  TBD  04/15/18 TBD TBD TBD
TRUCKS  

Frontier

05/15/17 TBD  TBD  Built Out 06/01/18
TBD TBD TBD
Titan Diesel XD CC 05/15/17 TBD  TBD  Built Out 05/15/18
TBD TBD TBD
Titan Gas CC (Incl XD) 05/15/17 TBD  TBD  Built Out 05/15/18 TBD TBD TBD

Gas/Dsl Sngl Cab (Incl XD)

05/15/17  TBD  TBD  Built Out 05/15/18 TBD TBD TBD

VANS

 

NV 200 Cargo

06/15/17 TBD  TBD  Built Out 04/15/18 TBD TBD TBD

NV Cargo 1500 / 2500 (V6)

06/15/17  TBD  TBD  Built Out 06/01/18 TBD TBD TBD
 NV Cargo 2500/3500 (V8) 06/15/17 TBD  TBD  Built Out 06/01/18 TBD TBD TBD

Passenger (V6)

06/15/17 TBD  TBD  Built Out 07/01/18 TBD TBD TBD
Passenger (V8) 06/15/17 TBD  TBD  Built Out 07/01/18 TBD TBD TBD

CROSSOVERS

 

Armada

02/15/17 TBD  TBD  Built Out 03/15/18 TBD TBD TBD
Juke TBD  TBD  TBD  TBD  TBD TBD TBD TBD
Murano 07/15/17 TBD  TBD  06/30/18  TBD TBD TBD TBD

Murano Cross Cabriolet

TBD  TBD  TBD  TBD  TBD TBD TBD TBD
Pathfinder 04/15/17  TBD  TBD  Built Out 05/15/18 TBD TBD TBD

Pathfinder HEV

04/15/17  TBD  TBD  Built Out  05/15/18 TBD TBD TBD

Quest

TBD  TBD  TBD TBD  TBD TBD TBD TBD

Rogue

04/15/17 TBD  TBD  Built Out 05/15/18 TBD TBD TBD
The following chart provides vehicle build-out and start-up dates for Nissan cars. These updates change regularly and were last updated on June 20, 2018.
Back to Top ^

RAM

RAM Build-Out & Start-Up Dates
07/31/17

Model

 2018 Order Banks Open 2018 Production Startup  2018 Lead Time  2018 Order Cutoff  2019 Order Banks Open 2019 Production Startup 2019 Lead Time 2019 Order Cutoff

VANS

 

Ram ProMaster City Van

06/08/17 07/24/17 Pool 6-8 weeks
Orders 18-20 weeks
10/11/18 11/09/18 01/02/19 TBD TBD

Ram ProMaster Commercial Van

05/11/17 07/24/17 12-14 weeks Built Out 06/08/18 09/17/18 TBD TBD

TRUCKS

 

Ram 1500 Quad/Crew Cab Pickup

06/08/17 08/28/17 12-14 weeks Built Out 06/08/18 07/23/18 TBD TBD
 Ram 1500 Reg. Quad & Crew - 6 Speed Transmission 06/08/17 08/28/17 12-14 weeks TBD TBD TBD TBD TBD
Ram 1500 Regular Cab Pickup 06/08/17 09/18/17 12-14 weeks  Built Out 06/08/18 07/16/19 TBD TBD

Ram 2500 Pickup

06/08/17 07/31/17 12-14 weeks 10/11/18 11/19/18 01/02/19 TBD TBD

Ram 3500 Pickup

06/08/17  07/31/17 12-14 weeks  10/11/18 11/19/18 01/02/19 TBD TBD

Ram Cab Chassis 3500

06/08/17 07/31/17 12-14 weeks  10/11/18 11/19/18 01/02/19 TBD TBD

Ram Cab Chassis 4500/5500 - Gas

06/08/17 07/31/17 12-14 weeks Built Out 11/19/18 01/02/19 TBD TBD
 Ram Cab Chassis 4500/5500 - Diesel 06/08/17 07/31/17 12-14 weeks  Built Out 11/19/18 01/02/19 TBD TBD
The following chart provides vehicle build-out and start-up dates for Ram trucks. These updates change regularly and were last updated on June 20, 2018.
Back to Top ^

Subaru

Subaru Build-Out & Start-Up Dates

Model

2018 Order Banks Open 2018 Production Startup 2018 Lead Time 2018 Order Cutoff 2019 Order Banks Open 2019 Production Startup 2019 Lead Time 2019 Order Cutoff

CARS

Legacy

N/A N/A 16-18 weeks Built Out 06/28/18 TBD 16-18 weeks TBD

Impreza

N/A N/A 16-18 weeks Built Out 07/12/18 TBD 16-18 weeks TBD

WRX/Sti

N/A N/A 16-18 weeks Built Out 05/24/18 TBD 16-18 weeks TBD

BRZ

N/A N/A 16-18 weeks Built Out 09/24/18 TBD TBD 05/11/19

SUV & CROSSOVERS

Ascent

N/A N/A 16-18 weeks TBD 03/20/18 TBD 16-18 weeks TBD
Forester N/A N/A 16-18 weeks Built Out 08/16/18 TBD 16-18 weeks TBD

Outback

N/A N/A 16-18 weeks Built Out 06/28/18 TBD 16-18 weeks TBD

Crosstrek

N/A N/A 16-18 weeks Built Out 06/21/18 TBD 16-18 weeks TBD

The following chart provides vehicle build-out and start-up dates for Subaru cars. These updates change regularly and were last updated on June 20, 2018.
Back to Top ^

Toyota

Toyota Build-Out & Start-Up Dates

Model

 2018 Order Banks Open  2018 Production Startup 2018 Lead Time  2018 Order Cutoff  2019 Order Banks Open 2019 Production Startup 2019 Lead Time 2019 Order Cutoff

CARS

 

Avalon (Gas)

03/10/17 05/01/17  8-12 weeks Built Out 01/01/18 TBD TBD 04/10/19 

Avalon HV (Hybrid)

03/10/17  05/01/17  8-12 weeks  Built Out 02/12/18  TBD TBD 04/10/19

Camry

04/10/17 05/01/17  8-12 weeks Built Out 06/11/18 TBD TBD 05/11/19

Hybrid

04/10/17  06/01/17  8-12 weeks  Built Out 06/11/18 TBD TBD 05/11/19

Corolla

05/10/17  07/01/17  8-12 weeks 12/11/18 03/12/18  TBD TBD 12/11/18

Prius

09/11/17  11/01/17  16-20 weeks  09/10/19 01/01/18 TBD TBD TBD

Prius C

04/10/17  06/01/17  8-12 weeks Built Out 06/11/18  TBD TBD TBD

PHV (Plug-In)

11/10/17 01/01/18 8-12 weeks  09/10/18 10/10/18 TBD TBD 02/11/19

V

09/11/17 11/01/17 8-12 weeks TBD  TBD TBD TBD TBD
 CH-R  01/01/17  TBD  8-12 weeks Built Out 04/10/18 TBD TBD 06/10/19
 Yaris iA  05/10/17  07/01/17  8-12 weeks Built Out 09/01/18 TBD TBD TBD

TRUCKS

 

Tacoma

06/12/17  08/01/17  8-10 weeks  Built Out 06/11/18 TBD TBD 05/10/19

Tundra

05/10/17  07/01/17  8-10 weeks Built Out 05/10/18 TBD TBD 04/10/19
VANS  

Sienna

08/10/17  10/01/17  8-10 weeks Built Out 08/01/18 TBD TBD TBD

& CROSSOVERS

 

4Runner

06/12/17  08/01/17  8-10 weeks Built Out 06/11/18 TBD TBD 05/10/19
Highlander 07/01/17  09/01/17  8-10 weeks Built Out 06/11/18 TBD TBD 06/10/19

Hybrid

07/10/17  09/01/17  8-10 weeks Built Out 06/11/18 TBD TBD 05/10/19

Land Cruiser

06/01/17  08/01/17  16-20 weeks  05/10/18 06/11/18 TBD TBD 05/10/19

Mirai (Fuel Cell)

11/01/17 TBD  TBD  08/13/18 11/01/18 TBD TBD TBD

Rav4

06/01/17  08/01/17  8-10 weeks 08/13/18 09/10/18 TBD TBD 05/10/19 

Rav4 Hybrid

06/01/17   08/01/17 8-10 weeks  08/13/18 12/01/18  TBD TBD 05/10/19

Sequoia

05/10/17  07/01/17  16-20 weeks  Built Out 05/10/18 TBD TBD 04/10/19 
The following chart provides vehicle build-out and start-up dates for Toyota cars. These updates change regularly and were last updated on June 20, 2018.
Back to Top ^

Volkswagen

Volkswagen Build-Out & Start-Up Dates

Model

2018 Order Banks Open  2018 Production Startup  2018 Lead Time 2018 Order Cutoff 2019 Order Banks Open 2019 Production Startup 2019 Lead Time 2019 Order Cutoff

CARS

Arteon N/A  N/A 11-13 weeks N/A N/A 07/30/18 11-13 weeks N/A

Golf

N/A  N/A 11-13 weeks Built Out 07/05/18 09/03/18 11-13 weeks N/A

Golf R

N/A  N/A 11-13 weeks Built Out 08/02/18 10/08/18 11-13weeks N/A
 Golf SportWagen N/A   N/A 11-13 weeks  Built Out 07/05/18 09/03/18  11-13 weeks  N/A
 Golf Alltrack N/A   N/A 11-13 weeks  Built Out 07/05/18 09/03/18 11-13 weeks  N/A 
 GTI N/A   N/A 11-13 weeks  Built Out 07/05/18 09/03/18 11-13 weeks  N/A 
 Bettle Coupe N/A   N/A 11-13 weeks  Built Out 07/05/18 09/03/18 11-13 weeks   N/A
 Bettle Convertible N/A   N/A 11-13 weeks  Built Out 07/05/18 09/03/18 11-13 weeks  N/A 
 Jetta N/A   N/A 11-13 weeks  Built Out 04/05/18 04/16/18 11-13 weeks  N/A 
 Passat N/A   N/A 11-13 weeks  Built Out 07/11/18 09/10/18 11-13 weeks  N/A 

TRUCK

Atlas

N/A  N/A 11-13 weeks Built Out 07/05/18 09/03/18 11-13 weeks TBD
 Tiguan N/A  N/A 11-13 weeks Built Out 07/05/18 09/03/18  11-13 weeks  TBD
























The following chart provides vehicle build-out and start-up dates for Volkswagen cars. These updates change regularly and were last updated on June 20, 2018.